When the Power Can Move, the Business Can Grow

image
A wire manufacturer building an 80,000 square foot plant decided to lay out production around the work rather than around the conduit. Moving a workstation now takes a weekend instead of two months.
  • MANUFACTURING · RICHFIELD, OHIO
image
Six buildings get reconfigured up to three times a week, and an eight-day fair brings 2,400 exhibitors. The fairgrounds stopped needing round-the-clock electricians and stopped taping down extension cords.
  • EVENTS · WASHINGTON COUNTY, PENNSYLVANIA
image
A 60-cart fleet could not all charge at once, in a barn full of low-hanging cords. Three overhead runs fixed both problems and freed up floor space
  • EV CHARGING · BUTLER, PENNSYLVANIA
image
A parking lot had to become an operational data center in months, on a 3.2 MW site.
  • DATA CENTER · NORTH OF LONDON
image
One tripped circuit used to take down several racks and send a team searching through a distribution panel.
  • DATA CENTER · OXFORD, ENGLAND